Solar Labels & Placards

Solar Labels & Placards

Code-compliant labels and placards for disconnects, equipment, and rapid shutdown, generated to match your specific system design.

Who this service is for

  • Installers who need a complete, print-ready label set for every permit package
  • EPCs standardizing labeling across install crews and jurisdictions
  • Contractors whose AHJ requires specific label placement and wording

What's included

Rapid shutdown labels

Labeling to identify rapid shutdown initiation points and system status, matched to the equipment used.

Disconnect & equipment labels

Labels identifying AC/DC disconnects, inverters, combiner panels, and other equipment.

Placard sets

Placards summarizing system information for first responders and inspectors.

Print-ready files

Label and placard artwork delivered ready to print and apply on site.

Workflow

How solar labels & placards works

1. Design finalized

Label content is generated from the finalized PV layout, single-line diagram, and equipment list.

2. Labels drafted

Required labels and placards are drafted to match code and AHJ-specific requirements.

3. Review

Label set is checked against the design and permit package for consistency.

4. Files delivered

Print-ready label and placard files are delivered alongside the permit package.

Information we'll need

Have this ready when you submit a design request:

  • Finalized PV layout and single-line diagram
  • Equipment list (modules, inverters, disconnects, combiner panels)
  • Project address (to confirm AHJ-specific label requirements)

Deliverables

What you'll receive back:

  • Rapid shutdown labels
  • Disconnect and equipment labels
  • System placards
  • Print-ready label/placard files

Get a complete label set

Labels and placards are included as part of a full design request, or can be requested once your design is finalized.

FAQs

Solar Labels & Placards — frequently asked questions

Yes — label and placard preparation is part of a complete permit package, generated once the design is finalized.

Yes, wording and placement requirements can vary by AHJ and by which NEC edition (including rapid shutdown requirements under NEC 690.56) that jurisdiction has adopted. We match labels to the specific project’s requirements.

In most cases yes, provided we have the finalized layout, single-line diagram, and equipment list — submit these through the design request form and note this in the special notes field.